On the list of prime issues confronted by the corporate was the additional waiting time for trucks that was fully a waste of time. The major rationale behind this problem was the absence of a proper schedule for your vehicles as mentioned from the case that the vehicles came whenever https://case-study-solution31200.bloguerosa.com/35367459/case-study-analysis-no-further-a-mystery