In this process, a round hole is excavated up towards the depth at which the soil will stand unsupported (about 0.5m for tender clay and 2m for stiff clay). Vertical boards known as laggings, are then established in place round the excavated encounter and they are held tightly from the https://personalcareproducts77665.blogaritma.com/29243675/rumored-buzz-on-pile-foundation-engineering-bangladesh